400MW/800MWh power grid side electrochemical energy storage project in Fushan Town, Ningyang County, Tai 'an, Shandong Province

400MW/800MWh power grid side electrochemical energy storage project in Fushan Town, Ningyang County, Tai 'an, Shandong Province

The power grid side electrochemical energy storage project is located in Fushan Town, Ningyang County, Tai 'an, Shandong Province, with a land area of 36,866.8 square meters and an investment of 1.3 billion yuan in the way. It is a power grid side electrochemical energy storage power station with a scale of 400MW/800MWh. The main equipment is lithium iron phosphate energy storage battery prefabrication chamber, integrated electrical room, PCS container, main transformer, etc. The energy storage system project scale is 400MW/800MWh, battery compartment 6.88MWh*120, PCS booster integrated compartment 120 sets, boost to 35kV, collected from the multi-circuit collector line to the booster station, and boosted to 220kV through 2*240MVA transformer. Through 220kV line access to State Grid Shandong Electric Power Company Ningyang Caishan 220kV substation.

Related products

The gas detector can be used to detect the concentration of combustible and toxic gases from time to time, and can be freely connected to alarm related equipment to ensure the safety of workers. It converts the toxic gas concentration at the site into an electrical signal and transmits it to the monitoring equipment located in the safety zone to achieve the purpose of monitoring the toxic gas concentration at the site.

ENVIRONMENT

GASES